PEMASANGAN PIPA GAS BAKAR MENARA OBOR DI LEPAS PANTAI DENGAN ALAT ANGKAT NON CRANE
Abstract
The aim of the study is to provide an overview of the installation of a torch tower fuel gas distribution pipe offshore non using crane. The problem faced in the implementation of the installation is the difficulty of installing the fuel gas distribution pipe because there is no conventional crane lifting equipment that can be used at a height of 175 meters, weighing 115 tons and in very limited work locations. The solution to overcome the problem is to divide the gas distribution pipe into several trunks and install it on the derick structure by lifting the pulley system (non crane). The results showed that the lifting method using a pulley was proven to be suitable and safe to use for installing a gas pipeline for torch towers offshore. The results of this study also recommend that work methods can be replicated by other work units that experience similar problems.
Keywords
Full Text:
PDFReferences
API RP 1111. (1999). Design, construction, operation and maintenance of offshore hydrocarbon pipelines (limit state design), API Publication, USA.
API Standard 521. (2014). Pressure relievering and depressuring system, 6th Edition, API Publication, USA.
Peraturan Pemerintah (PP) No. 11 Tahun 1979. (1979). Tentang keselamatan kerja pada pemurnian dan pengolahan minyak dan gas bumi.
Permennaker No. Per. 05/MEN/ 1985. (1985). Peraturan menteri tenaga kerja republik indonesia tentang pesawat angkat dan angkut.
Roger L Brauer. (1994), Safety and Health for Engineers, John Willey & Son Inc, New York.
Sulardi, S. (2017). Reposisi Pipa Transfer Line Flare Stack dengan Alat Roll Geser dan Metode Penarikan. Jurnal Teknologi Bahan dan Barang Teknik, 7(2), 63-70.
Sulardi, S. (2018). Keselamatan konstruksi untuk mencegah kecelakaan kerja pada pekerjaan perbaikan flare stack di PT. Pertamina RU V Balikpapan. JTT (Jurnal Teknologi Terpadu), 6(2), 82-89.
Sulardi, (2019), Keselamatan alat angkat dan alat angkut, penerbit nusa litera inspirasi, Kabupaten Cirebon, Indonesia.
Sulardi, (2019), Keselamatan dan kesehatan kerja industri pengolahan minyak (k3 kilang), Penerbit Nusa Litera Inspirasi, Kabupaten Cirebon, Indonesia.
Sulardi, (2019), Metode reposisi onstream pipa raw water dengan berbasis stress analysis, Jurnal Teknik Mesin, Universitas Islam Kalimantan, Banjarmasin.
Sulardi, S., Simatupang, S. P., & Lukman, L. (2021). resetting verticality flare stack dengan pengaturan tegangan guy wire. Info-Teknik, 22(1), 117-126.
UOP. (2014), callidus flaress for the petrochemical and petroleum industry, UOP Honey Well, USA.
DOI: https://doi.org/10.58267/petrogas.v4i2.123
Refbacks
- There are currently no refbacks.